More Innovative Spirit, More Availability
Wind to Energy GmbH
Development partnership on an equal footing with W2E
W2E Wind to Energy develops complete multi-megawatt wind turbines for the onshore sector. The technology installed makes these systems stand out on account of their long service life, high technical availability and maximum yields. The control system is a key part of the turbine. W2E relies here on the system solutions of Bachmann electronic, enabling them to meet all the requirements set by the grid codes.