TOM21172

Safe installation of offshore wind turbines with Boom Lock©

Offshore operations have increased rapidly in recent years: Wind turbines are thus becoming increasingly larger and wind farms are being located increasingly further away from the coast. To make their installation possible, ships have been continually adapted for operation in rough seas. However, up to now very little attention has been paid to cranes and their central task – lifting. Until today: This is because High Wind has developed a ground breaking solution in the form of Boom Lock©, using the technology of Bachmann electronic.